Feeder Status
Load by Transformer (A)
Solar Connections in Transformer (kW)
Renewable Share of Load by Transformer (%)
Open Faults by Type
LT Out Voltage Spread
Phase Currents by Transformer
Phase Imbalance
Peak Phase vs Rated LT Current
Transformer Count per Feeder
Switch Type Mix
Transformer Current Trend
LT Out Voltage Trend
Fault Trend (14 days)
Reliability -- Outage Minutes by Feeder (90 days)
Technical Loss (I²R) by Line
Transformer Loading Detail
| Transformer | Attached To | Capacity | Rated LT | R | Y | B | Peak / Rated | Imbalance | Captured |
|---|
Fault Log
| Asset | Type | Reason | Raised | Closed | Duration |
|---|
Activity Log
Every switch operation, load reading, fault entry, and topology change on this network — last 14 days. The complete history is retained in the database for audit purposes.
Anomalies
Transformers whose recent readings show a persistent trend -- closing in on rated capacity, or a sustained phase imbalance -- not just a single noisy reading. Detected automatically in the background; a normal reading pattern clears it on its own.
Chronic Equipment
Any feeder, AB/RMU, line, or transformer that's faulted 3 or more times in the last 90 days -- worth a closer look even when nothing is actively trending right now.
Restoration Priority
Every fault currently logged and still open, ranked by how many downstream transformers/LT-Outs are without power right now -- fix the top of this list first for the biggest restoration win. A count of 0 means this fault isn't currently causing an outage by itself.
Scheduled Maintenance
Plan a future switch operation -- feeder off, open an AB/RMU, open an RMU bay, or throw a switchable interlink -- and it runs automatically at that time, no one needs to be at the keyboard. A manual switch operation on the same equipment always overrides a still-pending schedule.
Schedule a new action
Ask GridWatch
Ask about this section's network -- feeder status, transformer loads, faults, load/voltage history. Read-only: it can't change anything.
Open Faults
Every currently unresolved fault across transformers, lines, and LT Outs. Pick a date/time to backdate the closure, or leave it blank to use the current time.
Org Structure
State → Region → Circle → Division → Section. Manage the organizational hierarchy Sections belong to (super_admin only). This does not change who can access which Section — that's a separate, existing setting.
User Management
Create and view accounts (super_admin only). Every account is either Section-level (full role-permitted control of one section) or Division-level (view-only across every section under a division) — super_admin needs neither.
+ New user
Login History
Every successful login, most recent first. Shows the last 24 hours by default — search for a user by name or email to see their full history.
Line register
▸ expand| Feeder | Line | From | To | Breaker | Status | Transformer |
|---|
Ring interlinks
| Interlink | Node A | Node B | Switch | State |
|---|